“...Shek 0, the road from
Wanchai Gap to Magazine Gap, the road connecting Pokfulam and
Victoria Roads contouring the Western side of Mount Davis, and
the extension of Lugard Road, whilst extensive widening improve-
ments were carried out to the Shaukiwan Road.
In Kowloon, considerable progress was made with the extension
of Coronation Road, also with, the road connecting Mongkoktsui
with Kowloon City ; and the road from the Kowloon City Road to
the China Light & Power Company's new Station and the Hong-
kong & Whampoa Dock Company's new houses at Tai Wan Bay
was completed.
Advantage was taken of the large amount of filling obtained
from the extension of Coronation Road referred to above to level
up portions of the low-lying areas east of Shanghai Street near
this point.
In the New Territories, the extensive improvements to that
portion of the Taipo Road between the 9th and 18th milestones
were nearly completed, whilst further improvements to this road
between- the .3rd and 5th mile-stones...”
|
|
2 |
|
New Page
“...D 13
8.Marine Court.
(Under Section 19 of Ordinance 10 of 1899.)
22. During the year 1920 four courts were held, viz.:
On the 7th day of February, 1920, to enquire into the
circumstances of the stranding of the British Steamship Iiaifong,
Official No. 95430 of London, Mr. Ernest Beresford Jones, certificate
of competency as Master No. 031087 Liverpool, was Master.
On the 19th day of February, 1920, to enquire into the
eircumstances of the stranding of the British Steamship Hong Wan
1, Official No. 73866 of Singapore, Mr. Harold Percy Robinson,
certificate of competency as Master No. 3701 Singapore, was Master.
On the 31st clay of March, 1920, to enquire into the charge
of absence without leave on the part of C. J. Kirkpatrick, whose
certificate of competency as Second Class Engineer was No. 4690
of Canada, Second Engineer of the British Steamship Fa,u Sang,
Official No. 105800 of London, Mr. Frederic Joseph Gill, certificate
of competency as Master No. 040042 of Dublin, was Master...”
|
|
3 |
|
New Page
“...Since the re-wiring mentioned last year, and the acquisition of
sufficient battery power, the internal Time Service has been
extremely satisfactory.
The occasional trouble with the Time Ball, arising from earth
leakage or want of adjustment of the releasing trigger, also
appears to have been overcome. There has been no failure since
September 27.
IX.Upper Air Research.
When on leave of absence in England the Director was requested
to confer with the Air Ministry with a view to advising the Hong-
kong Government what it was necessary to do on the meteorological
side to assist aviation in the Colony.
The Director visited the upper air research stations at Benson
and South Farnborough, and also conferred with the Director of the
London Meteorological Office and the Superintendent of Instruments
several times.
Facilities for obtaining the nccessarv information were
courteously accorded by Sir Napier Shaw and the Superintendents
of the above Departments, to whom the thanks of this government...”
|
|
4 |
|
New Page
“...was granted in two actions,
viz :The Attorney General of Hongkong and the Castlefield Steam-
ship Company, Limited v. Toong Yue (O. J. No. 33 of 1919); and
Wong Lan-sang and Chan Tso-hing v. Fong Yeung-chau (O. J. No.
193 of 1919), and also in the Matter of the Tai Sun Insurance and
.Banking Company Limited (in Liquidation) (M. P. No. 33 of 1918).
Privy Council judgments in the following actions were received
during the vear, viz., Li Hong-mi v. The Attorney General of Hong-
kong and others (0. J. No. 172 of 1917), and The Kin Tye Loong
v. The Wing Hang Hong and others (O. J. No. 89 of 1913). In the
first case the appeal was allowed without costs and in the other the
appeal was dismissed with costs.
5.A r> m i r a r;r v Juris n i oti o x.
Four actions were instituted during the year. One was settled
and the others are pending.
The fees collected amounted to $438.95 as against $588.30
.in 1919.
0.Bankruptcy Jurisdiction.
Thirty (30) petitions were filed, 18 being creditors1 petitions...”
|
|
5 |
|
New Page
“...- G 4 -
The amount of Commission col lee ted was $85.77 as against
152.06 in 1910. '
9.Registrar of Companies.
On the 31st December there were 357 companies on the Hong-
kong Register, of which 22 were in course of liquidation. During
the year 50 new companies were put on the Register and 10 struck oil'.
The fees collected in respect of China" coinpanies amounted
to $ 121,008.68 and those in respect of other companies to $ 11,132.90.
Two firms were registered under the Chinese Limited Partnership
Ordinance, 1911, and no firm was registered under ihe Limited
Partnership Ordinance, No. 18 of 1912/
Deposits of the total value of §4,310,000.00 have been made by
Insurance Companies under the Five and Marine Insurance Companies
Deposit Ordinance, 1917.
10-Fees and Commission.
The total sum collected during the year by way of fees and
commission amounted to $59,957.31 as against $01,305.87 in the
previous year.
11.Staff.
Sir William Rees-Davies, Chief Justice, proceeded on leave of
absence...”
|
|
6 |
|
New Page
“...12
5.Crown Bent Roll.
The total Crown Rent due in respect of leased lands in Hong-
kong and Kowloon (excluding certain Villages in Hongkong and
Kowloon entered in the Village Rent Roll) amounted for the year
ending 25th December to $449,379.24 an increase of $24,513.25
on the previous year. The total amount due in respect of leased
lands in the Villages of Hongkong and Kowloon appearing in the
Village Rent Roll for the year ending 30th September was
$3,526.45 a decrease of $121.40 on the previous year due mainly
to the resumptions, at Kowloon Tong. The total number of lots of
Crown Land appearing in the Rent Rolls with the Total Rents is
shown in Table V.
6.Scavenging Lanes.
Areas for Scavenging Lanes were, in the case of seven proper-
ties, either resumed by the Crown for money payments or dedicated
by the Crown Lessees as Scavenging Lanes in consideration of
their being granted by the Building Authority modifications or
exemptions from certain provisions of the Public Health and...”
|
|
7 |
|
New Page
“...Chinese houses on A.l.L. 88 were
completed and the erection of 26 Chinese houses on A.I.L's. 8-1
to 87 was commenced.
The erection of 30 Chinese houses in Li Chit Street, on M.L.
25, of 18 Chinese houses in Cliun Sing Street on I.L. 834, and of
9 Chiuese houses in Water Street, on M.L. 198 was completed.
Considerable progress was made with the erection of the im-
portant extension to St. Joseph's College on I.L. 1642.
The extensive business premises on LL's. 1864 and 1865 for
the Kwong Sang Hong, referred to in last years Report, were
completed.
The large Cigarette Factory on I.L. 1315, Bovvrington, was
nearing completion at end of the year.
Considerable progress was made with the erection on M.L.
103, Section B, in Des Voeux Road Central, of an addition to the
Hongkong Bank, and with the erection, on I.L. 291 A, No. 4,
Queen's Road Central, of a block of offices six storeys in height.
The erection of several additional godowns at Kennedy Town
was commenced and several of these and...”
|
|
8 |
|
New Page
“... were erected.
The following is a summary of the smaller works which have
been completed or commenced during the year, in addition to the
larger ones specifically mentioned above :
Works completed.
37 European houses in Hongkong including 1 in the Peak
District,
5 ,, Kowloon,
21 Chinese houses in Victoria,
19 ,, Hongkong Villages,
139 ,, Yaumati. and Mongkoktsui,
(> Taikoktsui,
17 ,, IShamshuipo, and
5 ,, Kowloon Villages,
besides numerous buildings of a non-domestic character in Hong-
kong and in Kowloon.
Works commenced.
15 European houses in Hongkong including 3 in the Peak
District,
3 ,, Kowloon,
23 Chinese houses in Victoria,
23 ,, Hongkong Villages,
112 Yaumati and Mongkoktsui,
15 ,, Taikoktsui,
94 Shamshuipo,
2 Kowloon Villages, and
20 ,, on the reclamation at the head of Kow-
loon Bay, besides numerous other buildings of a non-domestic
character in Hongkong and in Kowloon....”
|
|
9 |
|
New Page
“...- Q 33 P.W.R. Kowloon.
by the Sanitary Department. Sand deposits were removed as
they occurred. Repairs were made to the sewers in Hong Lok
Street at the junction of Nelson Street ; Shanghai Street between
Public Square Street and Wing Sing Lane ; Shanghai Street at
the junction of Soy Street; Pitt Street at the junction of Reclam-
ation Street; and to storm-water drain at Saigon Street outfall :
W.I. railings were also fixed alongside the nullah in Waterloo
Road.
All metal work in connection with the drainage systems was
inspected and, where necessary, repaired and tarred. About 317
feet of old disused drains of various sizes and types were destroyed
and filled in.
The details of the expenditure under this heading are as
follows
Labour for cleansing operations,
Repairs, ...............
Tools for cleansing operations,...
General incidental expenditure,
Total, ...
-as against $5,853.65 in the. previous year.
67. Gas. Lighting.The total number of lamps in use at the
end of the...”
|
|
10 |
|
New Page
“...Q 53
P.W.E. Hongkong.
Suppl// from Wong rude hong Reservoir to Repulse Bag
Hotel,An arrangement was concluded with the
Hongkong Hotel Company for Government to lay
a supply of water between these points, the Company
bearing a portion of the cost.
Owing to the difficult nature of the ground to be travers-
ed by the supply pipe, progress was slow, but, by
the end of the year, the greater portion of the 3"
W.I. pipe (about two miles in length) had been laid.
1920 Estimates,....................."$30,000.00
1920 Sup. Vote,............>........ 7,707.89 '
$37,707.89
1920 Expenditure,...............:.. 38,851.87
121. Public Health and Buildings Ordinance, 1903,Gom-
pensation and Resumptions.This vote provides for the resumption
of areas required in connection with development schemes, the
improvement of public streets or the provision of scavenging lanes
as well as for the removal of riding floors over the ends of streets
and other matters. Where houses are of moderate depth, a
modification...”
|
|
11 |
|
New Page
“...railings fixed.
Woosung Street, Pakhoi Street, Pitt Street, Canton Road,
Shanghai Street, Oharigsha Street, Reclamation Street and Soy
Street were all raised to their new levels.
, The following roads were kerbed and channelled, the footpaths
being paved with granolithic slabs and any necessary improvements
being made in front new buildings erected during the year:
Austin Road, Nan Chang Street,
Bowring Street, Nathan Road,
Coronation Road, Ningpo Street,
Haitan Street, Path from Nathan Road to
Hong Lok Street, Jordan Road,
Ivv Street, Peace Avenue, Ho Mun Tin,
Kansu Street, Temple Street,
Lai Chi Kok Road, Yu Chau Street,
Liberty Avenue, Ho Mun Tin, Yunnan Lane,
1920 Estimates, ...............$50,000.00
19-20 Sup. Vote, ............... 29,450.00
1920 Expenditure,...”
|
|
12 |
|
New Page
“...sewer in Wing Sing Lane to K.I.L. 1365 ; 6" sewer
in the lane between K.I.L's 720 and 721 ; 6" sewer in the lane
between K.I.L's 715 and 716 ; 6" sewer in Man Ming Lane
towards Nathan Road ; 9" sewer in Shantung Street to K.I.L.
1303 ; 6" sewer in the lane between Shanghai and Reclamation
Streets to K.I.L. 1387 ; S" sewer in Bowring Street from Shang-
hai Street to K.I.L. 421 ; 6" sewer in Austin Road from 'K.I.L.
1154 to K.I.L. 1297 ; 6" sewer to K.I.L. 1391 in the lane between
Portland Street to Hong Lok Street ; 6" sewer from Carnarvon
Road in the scavenging lane of K.I.L. 574.
The following extensions of storm-water drains were carried
out :15" and 12" storm-water drains from Jordan Road to K.I.L.
1134 ; 9" storm-water drain from Bowring Street to K.I.L. 1134;
18", 15", 12" and 9" storm-water drains in Austin Road from
K.I.L. 1154 to 1134.
The following storm-water drains were constructed :15"
and 12" storm-watdr drains in Canton Road between Kansu
Street and Public Square Street ; 4'0"...”
|
|
13 |
|
New Page
“...
31/12/20, 76,875.28
156. Chinese Cemeteries,Laying out new areas.A state-
ment of the works carried out under this heading will be found
in paragraph 37 of this Report.
1920 Estimates, ..................$500.00
1920 Expenditure, ............... 462.09
157. Ielephonic Communication to Police Stations,Submarine
Cables.The new submarine cables mentioned in paragraph 130
of last year's Report were laid at the early part of the year between
the Mainland and Lan Tan ; Lan Tan aud Cheung Chau : Hong-
kong and Lamma ; the Mainland and Crooked Island to establish
"telephonic communication with the undermentioned Police
Stations :
(a.) Tung Chung, (d.) Lamma,
(b.) Tai 0, (>.) Kut 0.
(c.) Cheung Chau,
and also the village of Mui Wo.
1920 Estimates, ...............$21,500.00
1920 Expenditure,............ 20,699.35
158. Electric Light Scheme for Taipo.-There was no ex-
penditure under this heading as it was decided to postpone this
scheme pending more detailed data with regard to the dry...”
|
|
14 |
|
New Page
“...478 and £3,341 respectively.
Local Postal Notes are coming into public favour as a means of
making remittances to Macao as they can be more easily cashed
than Money Orders. An increase of $8,000 is shewn under this
head in 1920.
Full details appear in Table VIII, IX and X.
6.Chinese Correspondence.
Chinese Delivery Section, General Post Office.
Duriugthe year this section handled 2,151,082 ordinary letters,
98,643 other articles, and 7,449 postal hong packets as against
2,066,899 ordinary letters, 93,097 other articles and 6,940 postal
hong packets in 1919.
The registered articles delivered amounted to 307,055 o£ which
197,930 were from the United States of America and Canada, and
109,125 from China and other countries, showing an increase of
37,857 as compared with 269,198 in 1919.
3,144 insured letters were dealt with as against 2,743 in 1919*
The total number of Chinese private boxes for which licences
were issued during the year was 304, an increase of 7 as compared
with 297 in...”
|
|