No. Title Date
1 Adjusting the main pillars to the necessary length
2 Adjusting the main pillars to the necessary length
3 Adjusting the main pillars to the necessary length
4 Adjusting the main pillars to the necessary length
5 Chantongia village roofs
6 Children sitting on a roof
7 Children sitting on a roof
8 Constructing the skeleton of the roof
9 Decorated roof construction
10 Dilapidated log drum house roof
11 Exterior of Akoya Baptist chapel with corrugated iron roof
12 Finished roof tiles are carried to the construction site
13 Finishing the roof of the granary
14 Finishing the roof of the granary
15 Finishing the roof of the granary
16 Finishing the roof of the granary
17 Finishing the roof of the granary
18 Finishing the roof of the granary
19 Finishing the roof of the granary
20 Finishing the roof of the granary